The Correct 40 Point Response is:
There have been
recent heavy rains.
There has been recent freezing and thawing.
There are new surface cracks near the edge of the dump point.
Someone has been loading out at the toe of the pile you are building.
The banks of your truck built stockpile are steeper than the angle of
repose.
The dumping area slopes downward toward the edge of the dump point.
The dumping area is not level from side to side.
The berm is not properly maintained or too near the edge of pile.
Conditions require backing toward the berm at an angle other than
perpendicular.
Give your team 40 Points for a correct response.