Double Jepardy!!

The Correct 60 Point Response is:

1. Benching (or stair-stepping) the highwall/pit wall to reduce the height of the working face.
2. Clearing or scaling loose and overhanging material.
3. Sloping the face to an angle less than the angle of repose.

Give your team 60 Points for a correct response.

Explanation