The Correct 50 Point Response is:

In trenches where any work is being done.
Near ponds or creeks where water can erode banks.
Near the top edge of a high wall, pit wall, or excavation.
On a stockpile with an under-pile draw point.
On a stockpile that has been loaded out at the toe.
A frozen bank that is thawing.
Material hung up on the inside of bins or hoppers.
Material from sloped conveyors.
Material from loading or hauling equipment.
Others?